Your panel is the heart of your electrical system. If yours is a Federal Pioneer Stab-Lok, a fuse box, or a 60/100-amp service struggling to keep up with today’s demands, an upgrade isn’t cosmetic. It’s the foundation every other electrical decision rests on. Brad personally inspects, plans, and pulls the permit so the upgrade is done once, done right, and ESA-certified.
Often paired with ev charger installation, knob & tube replacement, and hot tub & pool wiring. We coordinate the whole job under a single permit when it makes sense.

What’s included
- Load calculation and capacity planning for current and future demand
- Removal of legacy 60-amp or 100-amp service, fuse boxes, or Federal Pioneer Stab-Lok panels
- 200-amp service upgrade with new meter base, mast, and main breaker
- Permit pulled and ESA inspection coordinated end-to-end
- Coordination with Hydro One / Oshawa PUC for service reconnect
- Labelling and clean panel layout for future serviceability
When to call us
- Breakers tripping when major appliances run at the same time
- A panel with screw-in fuses or a Federal Pioneer Stab-Lok label
- Plans for an EV charger, heat pump, hot tub, or basement renovation
- Burn marks, buzzing, or warm spots near the panel
- Insurance company asking for documentation of your service rating
How it works
- 01On-site assessment
Brad reviews your existing service, current load, and what you’re planning. No call-centre middleman.
- 02Permit & schedule
We pull the ESA permit and book the utility disconnect window with the local provider.
- 03Install day
Old service out, new 200-amp service in, panel reorganized and clearly labelled. Power restored same day in most cases.
- 04Inspection & sign-off
ESA inspects, certificate is issued, and you get the paperwork your insurer or future buyer will want.




